College of Charleston Campus Access Control Project- Phase 3
The scope of work associated with this project includes the replacement of hardware, modification of existing door frames, replacement of number of doors and associated electrical to accommodate new campus wide access control system.
Drawings
(click to expand/collapse)

Name | Size | ||
02. Campus Access Phase 3 For Bidding Drawings 031425 | 9.0 MB |