TCTC Fulp Hall Chilled Water Upgrades #H59-6245-LC-H

The work includes the installation of tertiary pumps for the Fulp Hall building along with controls upgrades for the existing chilled water system. Additionally included is the testing, adjusting, and balancing of existing air side equipment.
Specs (click to expand/collapse)