TCTC Fulp Hall Chilled Water Upgrades #H59-6245-LC-H
The work includes the installation of tertiary pumps for the Fulp Hall building along with controls upgrades for the existing chilled water system. Additionally included is the testing, adjusting, and balancing of existing air side equipment.
Plan Holders
Date | Company | Contact |
11/18/24 3:37 pm |
Construct Connect
30 Tech Pkwy South Suite 100 Norcross, GA 30092 |
Joy Sayre
Content Specialist
Tel: (323) 602-5079
Fax: 866-570-8187
|
11/18/24 3:27 am |
Dodge Construction Network
2860 S State Hwy 161 Ste 160 #501 Grand Prairie, TX 75052 |
Jayalakshmi L
Tel: 413-376-7032
|
11/18/24 2:23 pm |
McCarter Mechanical, Inc.
685 John Dodd Road Spartanburg, SC 29303 |
Bailey Brooks
Tel: 864-301-8502
Fax: 864-599-7886
|
11/19/24 7:53 am |
Place Services Inc.
201 Gateway Drive Canton GA, GA 30115 |
Wil Fulbright
Director of Mechanical
Tel: 864-776-2993
Fax: None
|
11/19/24 9:00 am |
Waldrop Mechanical Services
331 S Hammett Rd Greer, SC 29651 |
Josh Tate
Estimator
Tel: 8649820233
|