Joynes Hall - General Building Mechanical Replacement and Upgrades at Winthrop University
Replacement and upgrades of the building's HVAC systems including removal of existing 2-pipe CHW/HW distribution system, fan coils, etc. with new 4-pipe hydronic system and fan coils throughout.
Plan Holders
Date | Company | Contact |
1/2/25 10:26 am |
Construct Connect
30 Tech Pkwy South Suite 100 Norcross, GA 30092 |
Joy Sayre
Content Specialist
Tel: (323) 602-5079
Fax: 866-570-8187
|
12/7/24 3:07 am |
Dodge Construction Network
2860 S State Hwy 161 Ste 160 #501 Grand Prairie, TX 75052 |
Jayalakshmi L
Tel: 413-376-7032
|
1/8/25 7:07 pm |
Dodge Construction Network
2860 S State Hwy 161 Ste 160 #501 Grand Prairie, TX 75052 |
Darlene Baker-Mann
Document Coordinator II
Tel: 844-326-3826
|
12/16/24 9:51 am |
Randolph & Son Builders, Inc
1010 Culp Road Pineville, NC 28134 |
Harsh Vipul Pandya
Tel: 6122966295
|